PT Prima Sarana Gemilang

Engineering - ABM Project

A trusted and reliable mining contractor in Indonesia and a leading technology-based, environmentally friendly mining company, always maintaining good relations with clients and customers and becoming a reference for ideal mining operations.

Weather Forecast

Daily weather in the Tompotika Valley area, PSG – ABM Project Site

loader-image
PT. Prima Sarana Gemilang's Site Project
5:43 pm, Jun 25, 2026
temperature icon 23°C
broken clouds
Humidity: 80 %
Pressure: 1011 mb
Wind: 7 mph
Wind Gust: 16 mph
Clouds: 83%
Visibility: 10 km
Sunrise: 5:47 am
Sunset: 5:52 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
8:00 pm
temperature icon
22°/24°°C 0 mm 0% 6 mph 75% 1011 mb 0 mm/h
11:00 pm
temperature icon
21°/22°°C 0.29 mm 29% 5 mph 86% 1012 mb 0 mm/h
2:00 am
temperature icon
20°/20°°C 0.04 mm 4% 5 mph 94% 1012 mb 0 mm/h
5:00 am
temperature icon
20°/20°°C 0 mm 0% 4 mph 95% 1013 mb 0 mm/h
8:00 am
temperature icon
24°/24°°C 0 mm 0% 5 mph 71% 1014 mb 0 mm/h
11:00 am
temperature icon
28°/28°°C 0 mm 0% 5 mph 53% 1012 mb 0 mm/h
2:00 pm
temperature icon
28°/28°°C 0 mm 0% 5 mph 56% 1010 mb 0 mm/h
5:00 pm
temperature icon
25°/25°°C 0 mm 0% 5 mph 72% 1011 mb 0 mm/h

Daily Report Production

Mine Accuracy, 19 June 2026

Unit Actual Running

Monday, 20 June 2026

Strategic Plan Area

ABM Project – PT Prima Sarana Gemilang

The New Project of Nickel Mining

Mine Nickel Operational

The Journey of Nickel Project