PT Prima Sarana Gemilang

Engineering - ABM Project

A trusted and reliable mining contractor in Indonesia and a leading technology-based, environmentally friendly mining company, always maintaining good relations with clients and customers and becoming a reference for ideal mining operations.

Weather Forecast

Daily weather in the Tompotika Valley area, PSG – ABM Project Site

loader-image
PT. Prima Sarana Gemilang's Site Project
4:35 pm, Aug 24, 2026
temperature icon 23°C
overcast clouds
Humidity: 62 %
Pressure: 1012 mb
Wind: 7 mph
Wind Gust: 18 mph
Clouds: 98%
Visibility: 10 km
Sunrise: 5:47 am
Sunset: 5:53 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
5:00 pm
temperature icon
23°/23°°C 0 mm 0% 7 mph 62% 1012 mb 0 mm/h
8:00 pm
temperature icon
20°/22°°C 0 mm 0% 8 mph 68% 1013 mb 0 mm/h
11:00 pm
temperature icon
19°/20°°C 0 mm 0% 7 mph 78% 1014 mb 0 mm/h
2:00 am
temperature icon
20°/20°°C 0 mm 0% 8 mph 82% 1013 mb 0 mm/h
5:00 am
temperature icon
19°/19°°C 0 mm 0% 7 mph 84% 1014 mb 0 mm/h
8:00 am
temperature icon
23°/23°°C 0 mm 0% 9 mph 69% 1016 mb 0 mm/h
11:00 am
temperature icon
27°/27°°C 0 mm 0% 11 mph 50% 1015 mb 0 mm/h
2:00 pm
temperature icon
27°/27°°C 0 mm 0% 10 mph 47% 1012 mb 0 mm/h

Daily Report Production

Mine Accuracy, 19 June 2026

Unit Actual Running

Monday, 20 June 2026

Strategic Plan Area

ABM Project – PT Prima Sarana Gemilang

The New Project of Nickel Mining

Mine Nickel Operational

The Journey of Nickel Project